High/Option School Projects
High Schools
Aloha
AHS/SHS Title IX
Visit the project page for more information.
Auditorium & Stage Upgrades
Install new code compliant thrust and black box theater stage and riser systems. Reconfigure side stage lighting positions and access ladders for safer student access. Install new aisle lighting. New stage lighting panels and phase 2 safety upgrades. Install new theatrical production, architectural and work lighting systems throughout. Install various safety modifications to railings in existing catwalks and grid levels.
Final Cost: $2,087,600
Funding: 2014 Bond
Schedule: 06/2018 - 09/2019
Auto Tech Program Renovation
Renovation of the Auto Tech area in support of the Career and Technical Education (CTE) program.
Budget: $1,650,000
Funding: Measure 98
Schedule: 02/2019 - 08/2019
2017 Career & Technical Education Renovations
Renovation of the Computer Science, Drafting, Construction, Business and Marketing, and Film areas in support of the Career and Technical Education (CTE) program.
Final Cost: $2,663,300
Funding: Measure 98
Schedule: 06/2017 - 09/2017
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Title IX
New concession stand and press box at the softball field.
Final Cost: $277,300
Funding: 2014 Bond
Schedule: 2016
District-Wide Unified Communication System
Visit the project page for more information.
Seismic Upgrades
Visit the project page for more information. Roofing was added to the scope of the seismic project at this school.
Synthetic Turf Replacement
Main stadium synthetic turf replacement.
Final Cost: $814,500
Funding: 2014 Bond
Schedule: 05/2015 - 08/2015
Other 2014 Bond Projects
Building doors and hardware upgrades; replace backstop netting; repair and resurface tennis courts; drop ceiling repairs.
Beaverton
Auditorium & Stage Upgrades
Resurface main performance stage. Install new code compliant thrust stage system. Reconfigure side stage lighting positions and access ladders for safer student access. Install new aisle lighting. Install new theatrical production, architectural and work lighting systems throughout. Install various safety modifications to railings in existing catwalks and grid levels. New manual line sets at the stage and new location and ladder to the grid.
Budget: $1,981,000
Funding: 2014 Bond
Schedule: 06/2017 - 09/2020
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Field Concession Stand Addition
Design and construction of new concessions facility and restrooms near the "Home" bleachers section.
Budget: $1,400,000
Funding: Donor
Schedule: 01/2019 - 08/2019
Gym Roof/Ceiling Repairs - Emergency Project
Repair/replacement of failing trusses in gym ceiling. New ceiling tiles, lighting and floor refinishing.
Final Cost: $1,377,300
Funding: 2014 Bond
Schedule: 05/2018 - 09/2018
Health Clinic
Renovation of approximately 2,560 square feet (2 classrooms) within the Annex building west of the main campus to house the Beaverton School-Based Health Center. This clinic, run by Virginia Garcia Memorial Health Center, provides care for children between the age of 4 and 20 who live within the Beaverton School District boundaries.
Final Cost: $570,800
Funding: Grant
Schedule: Fall 2014
HVAC System Upgrades
Upgrade HVAC and lighting systems in eastern classrooms, library and media center.
Final Cost: $3,900,000
Funding: 2014 Bond
Schedule: 06/2017 - 09/2017
Merle Davies Field Grading & Irrigation
Regrading of field, eliminating softball infield and installing irrigation system.
Final Cost: $115,400
Funding: 2014 Bond
Schedule: 01/2017 - 05/2017
Seismic Upgrades
Visit the project page for more information. Seismic work at this school was included in the Gym Roof/Ceiling Repairs emergency project.
West Annex Roof Replacement
Install a new roof overlay system.
Final Cost: $198,400
Funding: 2014 Bond
Schedule: 07/2017 - 09/2017
Other 2014 Bond Projects
Building doors and hardware upgrades; replace backstop netting; replace boiler; remove hazardous tree in 2nd Street parking lot.
Upcoming 2014 Bond Projects
Electrical upgrades.
Mountainside
New Building
Visit the project page for more information.
Southridge
Auditorium & Stage Upgrades
Enhance safety to stage access ladders, railings in existing catwalks and grid levels. Replace existing lighting at grid and manual step lighting. Check condition of raceway.
Final Cost: $138,200
Funding: 2014 Bond
Schedule: 06/2019 - 09/2020
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Title IX
New dugouts at the softball field; enclose the baseball batting cage.
Final Cost: $248,900
Funding: 2014 Bond
Schedule: 2015
District-Wide Unified Communication System
Visit the project page for more information.
Sports Fields Irrigation & Drainage Improvements
Install irrigation and drainage for baseball field improvements.
Final Cost: $208,000
Funding: 2014 Bond
Schedule: 11/2015 - 06/2017
Other 2014 Bond Projects
Building doors and hardware upgrades.
Sunset
AHS/SHS Title IX
Visit the project page for more information.
Auditorium & Stage Upgrades
Work at Sunset begins as an emergency declaration for lighting upgrades to address safety concerns. Install new theatrical production, architectural and work lighting systems throughout. Resurface main performance stage. Install new code compliant thrust stage system. Reconfigure side stage lighting positions and access ladders for safer student access. Install new aisle lighting. Install various safety modifications to railings in existing catwalks. Reconfigure sound control booth to allow additional path of egress from catwalks.
Final Cost: $1,706,000
Funding: 2014 Bond
Schedule: 06/2015 - 09/2019
Building Intercom & Clock System Replacement
Replace failing clock and public address (PA) systems.
Final Cost: $461,200
Funding: 2014 Bond
Schedule: 06/2016 - 12/2018
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Flagpole Addition
Install a 45 ft. flagpole for flying three flags - USA, State of Oregon, and Prisoner of War (POW). Mount low-voltage light to illuminate the flags.
Budget: $35,000
Funding: Donor
Schedule: Summer 2019
Multi-Functional Synthetic Athletic Fields
Construct new multi-functional synthetic turf athletic field.
Final Cost: $4,647,500
Funding: Donor
Schedule: 2014 - 2015
Roof Replacement
New roof to replace outdated one.
Final Cost: $5,126,100
Funding: 2014 Bond
Schedule: 06/2014 - 08/2014
Stadium Site Improvements
New decorative stadium gates and north perimeter fencing along with area landscape enhancements to be installed.
Budget: $939,000
Funding: Donor
Schedule: 06/2020 - 09/2020
Synthetic Turf Replacement
Replace stadium field sub-grade, drainage and artificial turf.
Final Cost: $1,243,800
Funding: 2014 Bond
Schedule: 06/2015 - 08/2015
Other 2014 Bond Projects
Building doors and hardware upgrades; replace air conditioning chiller in library.
Westview
Auditorium & Stage Upgrades
Install various safety modifications to railings in existing catwalks and stage access ladders. Add a code compliant storage area in catwalk. Upgrade of production lighting system. New emergency lighting at the black box to be added. Existing step lights and work lights to be replaced.
Budget: $181,400
Funding: 2014 Bond
Schedule: 06/2019 - 09/2020
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Title IX
Improvements to the softball and baseball concessions. New softball scoreboards. New softball dugouts and press box. Enclose the softball batting cage.
Final Cost: $504,500
Funding: 2014 Bond
Schedule: 2015
District-Wide Unified Communication System
Visit the project page for more information.
Flooring Repairs
Replace VCT flooring in the student center.
Final Cost: $159,500
Funding: 2014 Bond
Schedule: 06/2017 - 09/2017
Manufacturing Career & Technical Education
Renovation of the shop area to support a Manufacturing Career and Technical Education (CTE) program.
Budget: $316,000
Funding: Measure 98
Schedule: 06/2020 - 09/2020
Roof Replacement
Re-roof by overlay of existing roofing in a phased project over two years.
Final Cost: $4,476,700
Funding: 2014 Bond
Schedule: 06/2017 - 11/2018
Other 2014 Bond Projects
Building doors and hardware upgrades; repair portable classroom partition walls; sports fields irrigation improvements; carpet replacement in portables.
Option Schools
- Arts & Communication Magnet Academy (ACMA)
- Capital Center: Health & Science School (HS2) / School of Science & Technology (SST)
- International School of Beaverton (ISB)
- Merlo Station Community High School
Arts & Communication Magnet Academy (ACMA)
Building Replacement
Visit the project page for more information.
Capital Center: Health & Science School (HS2) / School of Science & Technology (SST)
Capital Center Improvements & Data Center
Visit the project page for more information.
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Flooring Repairs
Convert all hallways to polished concrete. Replace flooring in 27 classrooms and 4 offices.
Final Cost: $521,000
Funding: 2014 Bond
Schedule: 06/2017 - 09/2018
Status: Complete
Other 2014 Bond Projects
Building doors and hardware upgrades; fire alarm; renovate seclusion room.
International School of Beaverton (ISB)
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Gym Truss Repair
Repair of three wood trusses in gym showing visible signs of cracking.
Budget: $140,000
Funding: 2014 Bond
Schedule: 06/2019 - 08/2019
Status: Complete
Other 2014 Bond Projects
Building doors and hardware upgrades; replace carpet and rubber cove base in three portable buildings.
Upcoming 2014 Bond Projects
Fire alarm system upgrades; roofing; HVAC.
Merlo Station Community High School
Commercial Construction Trade Program
Conversion of three existing classrooms, loading dock and miscellaneous storage areas into one Career Technical Education (CTE) program classroom/workshop space. The vocational lab space will provide hands-on training for various commercial construction trades. Mock-up walls etc. will allow students to learn installation of electrical, mechanical and plumbing systems in addition to framing and drywall installation. Exterior spaces will provide expansion of the program allowing additional options for students to learn foundation forming/pouring, small structure framing and utility trenching/placement.
Budget: $1,000,000
Funding: Measure 98
Schedule: 04/2019 - 09/2020
Status: In Progress
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Heating/Cooling System & Controls Replacement
Replacement of all rooftop HVAC systems and associated equipment, including upgraded building HVAC controls throughout.
Final Cost: $2,037,000
Funding: 2014 Bond
Schedule: 06/2018 - 09/2018
Status: Complete
Roof Replacement
Install a completely new roofing system, new access stairway and safety tie-offs.
Final Cost: $4,409,500
Funding: 2014 Bond
Schedule: 06/2018 - 09/2018
Status: Complete
Other 2014 Bond Projects
Building doors and hardware upgrades; replace failing clock system; remove trees damaging the parking lot and repair pavement.
Upcoming 2014 Bond Projects
New kitchen flooring.
MAJOR HIGH/OPTION SCHOOL
2014 BOND PROJECTS
MAJOR DISTRICT-WIDE
2014 BOND PROJECTS